Past Works (KSHIP I)

Sl No Package No Description of Road Contractor Name(M/s) Length (in kms) Contractor Period (in months) Contract Amount (in crore Rs) Revised Contract Amt.( in crore Rs) Starting date as per contract Completion date as per Contract Actual date of completion Status
1 U1 Upgradation of road from Kalmala-Junction to Sindhanur NCC - Maytas(JV),Hyderabad 76.7 30 68 94.75 Jan-2002 Jul-2004 Mar-2006 Completed
2 U2 Upgradation of road from Sindhanur to Budugumpa KMC Constructions Limited,Hyderabad 77.54 30 72 87.61 Jan-2002 Jul-2004 Sep-2005 Completed
3 U3 Upgradation of road from Hattigudur to Bidar HCC - SEL (JV),Mumbai 188.43 48 140 174 Jan-2002 Jan-2006 Jul-2006 Completed
4 U4 Upgradation of road from Bijapur to Tikota Bharat - PCC (JV), Sholapur 20.15 17 15 14 Feb-2002 Dec-2004 May-2004 Completed
5 U5 Upgradation of road from AP Border to Kalmala Junction Maytas Infra Ltd. Hyderabad 31 24 29 36 Jan-2002 Jan-2004 Jul-2005 Completed
6 U6 Upgradation of road from Sankeshwar to Yaragatti Tarmat Infrastructural & Engineering Ltd.,Mumbai 73.18 34 77.24 93 Mar-2003 Mar-2006 Aug-2009 Completed
7 U7A Upgradation of road from Bijapur to Krishna Bridge PBA Infrastructure Ltd., Mumbai 48.1 30 51.11 59.45 May-2004 Nov-2006 Sep-2007 Completed
8 U7B Upgradation of road from Krishna Bridge to Lokapur Patel – KNR (JV), Hyderabad 55.64 30 67.62 77.71 May-2004 Nov-2006 Jun-2007 Completed
9 U8 Upgradation of road from Hungund to Belgaum KMC Constructions Co. Ltd. 170.31 36 281 348.15 Mar-2003 Mar-2006 Dec-2006 Completed
10 U11 Upgradation of road from Hiriyur to Bellary L&T Ltd., Chennai 144 36 269 277.85 Mar-2003 Mar-2006 Jul-2006 Completed
11 BR-1 Reconstruction of 9 Bridges SP.Lakshmanan,Chennai - 12 2.45 2.08 Nov-2001 Nov-2002 Nov-2002 Completed
12 U3-BR Construction of PSC Bridge across Bennethora River BVSR Constructions Pvt Ltd., Hyderabad - 17 7.79 7.79 Dec-2005 May-2007 - Terminated & handed over to NH
13 U4-BR Construction of Bridge at Ch.12.334 of road road from Bijapur to Tikota B.V.Subba Reddy, Hyderabad - 12 2.56 2.94 Jun-2005 Jun-2006 Aug-2008 Completed
14 BP1 Construction of Bypass for Raichur Town in Raichur District(Contrcat No.BP1) Reddy Veeranna Constructions Pvt Ltd., Bangalore 8 15 15.62 15.62 Jan-2006 Apr-2007 Jan-2014 Completed
15 BP2 Construction of Bypass for Bijapur for Bijapur Town Mehul Constructions Co.Pvt.Ltd., Solapur 7 12 9.81 13.75 Dec-2006 Dec-2007 Nov-2008 Completed
16 M1 Rehabilitation of road from Mudgal to Hungund HP Madhukar,Hubli 39.68 15 12.2 17.57 Jul-2003 Oct-2004 Apr-2006 Completed
17 M2 Rehabilitation of road from Tikota to Badachi Rohan Builders (India) Pvt Ltd. – J. M Mhatre (JV) 42.8 16 10 9.43 Feb-2002 Jun-2003 Aug-2004 Completed
18 M3 Rehabilitation of road from Athani to Shedbal Tarmat Infrastructural & Engineering Ltd.,Mumbai 49.51 14 13 11.69 Feb-2002 Apr-2003 Mar-2004 Completed
19 M4 Rehabilitation of road from Shedbal to Sankeshwar SP Lakshamanan ,Chennai 55.5 22 12.29 17.03 Feb-2002 Sep-2004 May-2006 Completed
20 M5 Rehabilitation of road from Srirangapatna to Chinya Maheshwar Naidu,Hyderabad 32 11 16.95 20.42 Jun-2005 May-2006 Dec-2006 Completed
21 M6 Rehabilitation of road from Chinya to Nelligere Maheshwar Naidu,Hyderabad 33 11 16.03 21.8 Nov-2005 Oct-2006 Jul-2007 Completed
22 M7 Rehabilitation of road from Nelligere to Kibbanahalli KMC Constructions Co. Ltd. 47 14 21.29 25.65 Nov-2005 Jan-2007 Jun-2007 Completed
23 M8 Rehabilitation of road from Kibbanahalli to Huliyar M/s National Asphalt Products and Construction Company 36.46 14 11.98 13.03 Nov-2001 Jan-2003 Mar-2003 Completed
24 M9 Rehabilitation of road from Huliyar to Hiriyur KNR Constructions Hyderabad 48.65 17 27 25.13 Dec-2004 May-2006 Mar-2007 Completed
25 M10 Rehabilitation of road from Bellary to Devinagar Rani Constructions Pvt. Ltd 40 15 20 21.32 Jul-2003 Oct-2004 Nov-2006 Completed
26 M11 Rehabilitation of road from Devinagar to Sindhanur R.N. Shetty & Co.Hubli 42.72 15 20.55 30.18 Jun-2005 Sep-2006 Oct-2007 Completed
27 M12 Rehabilitation of road from Sindhanur to Lingsugur R.N. Shetty & Co.Hubli 51.96 20 11.37 13.44 Jan-2002 Oct-2003 Jun-2004 Completed
28 M13 Rehabilitation of road from Lingsugur to Hattigudur Tantia Construction Company Limited 67.44 22 15.87 20.36 Jan-2002 Dec-2003 Oct-2005 Completed
29 M14 Rehabilitation of road from Mariyammanahalli to Ittagi R.N. Shetty & Co.,Hubli 52.95 20 31.48 30.32 Nov-2004 Jul-2006 May-2007 Completed
30 M15 Rehabilitation of road from Ittagi(Kallaubavale cross) to Harihara Afcon Infrastructure LTd.,Mumbai 53.93 20 31 34.28 Dec-2004 Aug-2006 May-2008 Completed
31 M16 Rehabilitation of road from Harihara to Honnali Reddy Veeranna Constructions Pvt.Ltd 35.37 15 21.75 23.21 Dec-2004 Mar-2006 Apr-2007 Completed
32 M17 Rehabilitation of road from Honnali to Shimoga M. Venkata Rao, Vishakapatnam 41.22 23 11.48 17.38 Nov-2001 Dec-2002 Oct-2003 Completed
33 M18 Rehabilitation of road from Belur to Chikkamagalur M/s Maytas Infra Limited,Hyderabad 24 23.5 8.17 9.63 Nov-2001 Jun-2002 Nov-2003 Completed
34 M19 Rehabilitation of road from Chikkamagalur to Tarikere M/s Larsen & Toubro 57.7 18 14.95 25.25 Jan-2001 May-2004 Oct-2004 Completed
35 M24 Rehabilitation of road from Alnawar to Yellapur Patel Engineering Ltd., Hyderabad 57.1 21 24.40 26.65 Feb-2004 Feb-2006 Dec-2006 Completed
36 M25 Rehabilitation of road from Yellapura to Sirsi M. Venkata Rao, Vishakapatnam 51 18 21.12 21.12 Jun-2005 Dec-2006 May-2009 Completed
37 M26 Rehabilitation of road from Sirsi to Mavingundi M. Venkata Rao, Vishakapatnam 53 9 20.02 20.02 Dec-2005 Sep-2006 May-2009 Completed
38 M27 Rehabilitation of road from Kumbarvada to Sadashivgarh M. Venkata Rao, Vishakapatnam 64 24 19.31 21 Mar-2005 Mar-2007 Apr-2007 Completed
39 M28 Rehabilitation of road from Ramanagara(Londa) to Kumvbarvada B. Seenaiah & Co., Hyderabad 56.85 21 15.90 17.43 Jun-2004 Feb-2006 Mar-2007 Completed
40 M29 Rehabilitation of road from Yaragatti to Hulikatti KNR Constructions Hyderabad 29.6 15 13.36 14.25 Feb-2004 May-2005 Sep-2005 Completed
41 M30 Rehabilitation of road from Kalmala Junction to Kavital Satish – Tantia (JV) 50 18 21.22 30.23 Jul-2003 Jan-2005 Aug-2006 Completed
42 M31 Rehabilitation of road from Kavital to Mudgal Maheshwar Naidu – Prakash (JV) 52.46 19 19.55 25.33 Jul-2003 Feb-2005 Oct-2005 Completed
43 M32 Rehabilitation of road from Nanjumalige Circle in Mysore city to PWD KM 62.00 on Mysore-Manandavadi road. KNR Constructions Hyderabad 58.9 22 23.87 28.01 Feb-2004 Dec-2005 Jun-2006 Completed
44 M33 Rehabilitation of road from Navalgund to Ron GVR Constructions Pvt Ltd, Chennai 44.36 17 27.02 29.9 Mar-2005 Aug-2006 Dec-2007 Completed
45 M34 Rehabilitation of road from Ron to Kushtagi IVRCL Infrastructure & Projects Ltd, Hyderabad 52.31 20 25.38 31.83 Mar-2005 Nov-2006 Apr-2007 Completed
46 U9 Upgradation of road from Khanapur to Alnawar B. Seenaiah & Co.(Projects) Ltd, Hyderabad 35.24 17 27.03 23.42 Mar-2005 Aug-2006 Feb-2009 Completed
47 U10 Upgradation of road from Hulikatti to Nargund GVR Constructions Pvt Ltd,Chennai 20.67 14 19.62 18.25 Mar-2005 May-2006 Jul-2008 Completed
48 M4-A Rehabilitation of road Kagwad to Maharashtra Border S.F.Chougule, Sangli 2.5 5 1.3 2.66 Jun-2006 Feb-2007 Jun-2007 Completed
49 M4-R Improvement of road from Kamatnur to NH-4 and Improvement of Distressed road from Chikodi to Sankeshwar T.K.Rajan,Mangalore 24.36 6 6.95 6.81 Jun-2006 Mar-2007 Mar-2007 Completed
50 M32-A Improvements of road on Mysore - Manathwadi in Mysore DistM32A(PWD Km 62 to PWD KM 92+500) KNR Constructions, Hyderabad 30.5 5 11.58 13.14 Apr-2007 Dec-2007 Feb-2010 Completed


Past Works (KSHIP-I)

The Karnataka State Highway Improvement Project is being implemented with the financial assistance of the IBRD (The World Bank) in line with the Project & Loan Agreement dated 21-07-2001. The original cost of the project was Rs.2030.27 Crore, which includes World Bank loan of Rs. 1635.21 crores (US $ 360.00 million) being 80% of the project cost and GoK share of 395.06 crore being 20% of the Project Cost.

The cost of the Project has been revised to Rs. 2304.49 crore and approved by the Government vide G.O. No. PWD 55 EAP 2006, dated 25-11-2006.The Project Completion Date has been extended from 30-06-2006 to 31-10-2007. The loan closing date has been extended from 31-12-2006 to 31-01-2008.The World Bank loan Agreement is concluded on 31-01-2008. The cost of the Project has been further revised to Rs. 2389.49 crore. The Project Completion Date has been extended from 31-10-2007 to 31-07-2010. A proposal has been placed before SLCC for revision of the project period from 31-07-2010 to 31-03-2011.

Physical Progress:

The total project length of 2414 Kms(Revised length -2385) have been taken up for improvement in 50 contract packages under Upgradation and Rehabilitation category. Out of the total road length of 2385 kms a length of 2384 kms accounting for 99.96% of the total length has been completed and opened to traffic as on date (Nov 2010)

Project Details:

Description Upgradation Rehabilitation Bridges Bypasses Total
Total No. of packages   10   35   3   2   50
Original Project length Length in Km   885   1514     15   2414
Revised Project length Length in Km   885   1485**     15   2385
Total Completed length in Km   885   1485     14   2384
Completed packages   2   1   3   1   48
Balance Packages to be completed       1   1   2
Balance length in Km         1   1

Note:
Length of 19 Kms within Anshi National Park in Uttra Kananada District deleted from M27 Package(Rehabilitation)

Length of 10Kms in Rajiv Gandhi National Park (Nagarahole) area is deleted from M32A package.(Rehabilitation)

Balance work in 2 packages is about 1 km of road length and 1 bridge. The balance works are expected to be completed by March 2011.

Financial Progress:

Project Expenditure: -

The Project has achieved the financial Progress of 98.41 % against the Re-revised cost of Rs.2389.49 Crore up to end Nov 2010. The Loan Closure Date is 31.01.2008.

Original Cost Revised Cost Re Revised Cost Cumulative Expenditure % of Progress
2,030.27 2,304.49 2389.49 2351.59 98.41 %

The component wise expenditure details are as under (Rs in Crore) :

Expenditure Category Original
Project Cost
Revised Project Cost as per G.O Nov, 2006 Re-Revised Project Cost Cumulative Cumulative Expenditure up to November 2010
1 2 3 4 5
 Civil Works  1564.16  2087.11  2147.66  2111.58
 Goods  27.93  18.05  16.90  16.90
 Services  147.39  182.98  208.58  206.76
 Front-end-fee  16.35  16.35  16.35  16.35
 Un-allocated  274.44  -  -  -
Total 2,030.27 2,304.49 2389.49 2351.59

The year wise physical & financial progress since inception is as below:

Rs in Crores.

Year Financial (Rs.Crore) Physical (Kms)
2001-02  53.5  --
2002-03  161.23  191
2003-04  231.53  366
2004-05  480.26  510
2005-06  541.35  666
2006-07  524.62  449
2007-08  195.8  132
2008-09  73 .14  40
2009-10  66.90  30
2010-11 Nov  6.91  
Front End fee  16.35  --
Total  2351.59  2384
KSHIP road map



WAP-1 : Malavalli to Pavagada
Road Length: 194.34 Km ; Duration: 30 Months Construction + 90 Months Maintenance
Construction Cost: Rs 576 Crores ; Annuity Cost(Biannual): Rs 1306 Cr(239 Cr + 15 Installments of Rs 71.15 Cr)
Construction Schedule: 06-Nov-2014 to 06-May-2017
Executing Agency: M/S Mysore Bellary Pvt Ltd(M/S Sadbhav-GKC(JV))
Construction Supervision Consultant: M/S LEA Associates South Asia Private Ltd
WAP-2 : Mudhol to Nippani
Road Length: 107.94 Km ;   Duration: 24 Months Construction + 96 Months Maintenance
Construction Cost: Rs 331 Crores ; Annuity Cost(Biannual): Rs 768 Cr(136 Cr + 16 Installments of Rs 39.49 Cr)
Construction Schedule: 19-Jan-2015 to 19-Jan-2017
Executing Agency: M/S Ashok Buildcon-GVR(JV)
Construction Supervision Consultant: M/S Aarvee Associates Architects Engineers& Consultants Pvt Ltd
WAEP-3A : Shimoga-Shikaripura-Anandapuram
Road Length: 82 Km ;   Duration: 32 Months
Construction Cost: Rs 264.73 Crores ; Construction Schedule: 28-4-2015 to 27-12-2017
Executing Agency: M/S Patel Engineering Pvt Ltd
Construction Supervision Consultant: M/S Roughton International ltd in association with M/S SATRA Infrastructure Management Services Ltd
WAEP-3B : Shikaripura-Anavatti-Hangal
Road Length: 71.63 Km ;   Duration: 29 Months Construction
Construction Cost: Rs 224.7 Crores ; Construction Schedule:
Executing Agency: M/S RNS Infrastructure Ltd
Construction Supervision Consultant: M/S Roughton International ltd in association with M/S SATRA Infrastructure Management Services Ltd
WAEP-4 : Managuli-Devapura
Road Length: 109.953 Km ;   Duration: 33 Months Construction
Construction Cost: Rs 317.05 Crores ; Construction Schedule:
Executing Agency: M/S Sadbhav Engineering Ltd
Construction Supervision Consultant: M/S Roughton International ltd in association with M/S SATRA Infrastructure Management Services Ltd.
WEP1 : Hoskote to Chintamani Bypass of SH-82
Road Length: 52.4 Km ;   Duration: 30 Months
Contract Amount: Rs 98.22 Crores
Schedule: 13-Aug-2011 to 12-Feb-2014
Executing Agency: M/s Lanco Infratech Ltd
Construction Supervision Consultant: EGIS International
WEP2a : Haveri to Hanagal SH-2
Road Length: 31.784 Km ;   Duration: 21 Months
Contract Amount: Rs 92.54 Crores
Schedule: 02-Mar-2013 to 22-Dec-2014
Executing Agency: M/s DRN Infrastructure, Hubli
Construction Supervision Consultant: EGIS International
WEP2b : Hanagal to Tadasa of SH-1, SH-2
Road Length: 43.476 Km ;   Duration: 21 Months
Contract Amount: Rs 97.87 Crores
Schedule:
Executing Agency: M/S DRN Infrastructure
Construction Supervision Consultant: EGIS International
WEP3 : Dharwad to Saundatti of SH-34
Road Length: 36 Km ;   Duration: 41 Months
Contract Amount: Rs 84.44 Crores
Schedule: 28-Jul-2011 to 01-Dec-2014
Executing Agency: M/s RVCPL-RIDL JV
Construction Supervision Consultant: EGIS International
WEP4 : Tinthni to Kalmala of SH-61 & SH-15
Road Length: 73.80 Km ;   Duration: 36 Months
Contract Amount: Rs 160.79 Crores
Schedule: 13-Aug-2011 to 12-Aug-2014
Executing Agency: M/s Patel Engineering Ltd
Construction Supervision Consultant: EGIS International
WEP5 : Chowdapur to Gulbarga of SH-22
Road Length: 28.63 Km ;   Duration: 21 Months
Contract Amount: Rs 61.55 Crores
Schedule: 19-Jul-2011 to 18-Apr-2013
Executing Agency: M/s SRK-KCL JV
Construction Supervision Consultant: EGIS International
AEP1 : Magadi to NH-48 to Koratagere in Tumkur and Ramanagara Districts
Road Length: 68.20 Km ;   Duration: 33 Months
Contract Amount: Rs 116.69 Crores
Schedule: 21-Mar-2012 to 20-Dec-2014
Executing Agency: M/s. KNR Constructions Ltd
Construction Supervision Consultant: SMEC International
AEP2 : Pavagada to AP Border of SH-3
Road Length: 23.205 Km ;   Duration: 18 Months
Contract Amount: Rs 43.30 Crores
Schedule: 29-Mar-2012 to 28-Sep-2013
Executing Agency: M/s. GVR-RMN (JV)
Construction Supervision Consultant: SMEC International
AEP3 : Gubbi to Mandya of SH-84
Road Length: 108.62 Km ;   Duration: 33 Months
Contract Amount: Rs 196.81 Crores
Schedule: 21-Mar-2012 to 06-Dec-2014
Executing Agency: M/s. KMC-VDB (JV)
Construction Supervision Consultant: SMEC International
AEP3A : Gubbi-Beeragonahalli (near Yediyur) of SH-84
Road Length: 49.03 Km ;   Duration: 21 Months
Contract Amount: Rs 122.38 Crores
Schedule:
Executing Agency: M/S DRN Infrastructure, Hubli-30
Construction Supervision Consultant: SMEC International
AEP3B : Beeragonahalli (near Yediyur) - Mandya of SH-84
Road Length: 59.09 Km ;   Duration: 33 Months
Contract Amount: Rs 198.27 Crores
Schedule:
Executing Agency: M/S D.P Jain & Co Infrastructure Pvt Ltd
Construction Supervision Consultant: SMEC International
AEP4 : Jaglur to NH-13 and from SH-19 of KSHIP Road to Molakalmuru of SH-2
Road Length: 14.38 Km ;   Duration: 15 Months
Contract Amount: Rs 31.26 Crores
Schedule: 21-Mar-2012 to 21-Jun-2013
Executing Agency: M/s. GVR-RMN (JV)
Construction Supervision Consultant: SMEC International
AEP5 : Padubidri to Karkala of SH-1
Road Length: 27.80 Km ;   Duration: 18 Months
Contract Amount: Rs 61.27 Crores
Schedule: 05-Mar-2012 to 20-Sep-2013
Executing Agency: M/s. RNS Infrastructure Ltd
Construction Supervision Consultant: SMEC International
AEP6 : Davangere to Birur of SH-76
Road Length: 105.63 Km ;   Duration: 33 Months
Contract Amount: Rs 202.57 Crores
Schedule: 21-Mar-2012 to 20-Dec-2014
Executing Agency: M/s.Gammon India Ltd
Construction Supervision Consultant: SMEC International
AEP6A : Davangere to Channagiri of SH-76
Road Length: 53.65 Km ;   Duration: 21 Months
Contract Amount: Rs 181.45 Crores
Schedule: 15-Dec-2015 to 15-Sep-2017
Executing Agency: M/S JMC Projects (India) Ltd.
Construction Supervision Consultant: SMEC International
AEP6B : Chennagiri to Birur of SH-76
Road Length: 51.98 Km ;   Duration: 22 Months
Contract Amount: Rs 136.78 Crores
Schedule: 1-Sep-2015 to 1-Jul-2017
Executing Agency: M/s D P Jain & Co, Infrastructure Pvt. Ltd.,
Construction Supervision Consultant: SMEC International
AEP7 : Shelvadi to Mundargi of SH-45
Road Length: 63.44 Km ;   Duration: 33 Months
Contract Amount: Rs 121.25 Crores
Schedule: 21-Mar-2012 to 20-Dec-2014
Executing Agency: M/s. KNR Constructions Limited
Construction Supervision Consultant: SMEC International
AEP8 : Mudgal to Gangawathi of SH-29
Road Length: 74.20 Km ;   Duration: 36 Months
Contract Amount: Rs 152.63 Crores
Schedule: 26-Mar-2012 to 25-Mar-2015
Executing Agency: M/s. KNR Constructions Ltd
Construction Supervision Consultant: SMEC International
AEP9 : Soundatti to Kamatagi(including Mulur Ghat) of SH-34 and SH-14
Road Length: 130.13 Km ;   Duration: 36 Months
Contract Amount: Rs 225.50 Crores
Schedule: 21-Mar-2012 to 20-Mar-2015
Executing Agency: M/s. Ramky Infrastructures Ltd
Construction Supervision Consultant: SMEC International
AEP9A : Saundatti to Halagatti Junction(Ramdurga) (including Mullur ghat)
Road Length: 42.065 Km ;   Duration: 21 Months
Contract Amount: Rs 138.24 Crores
Schedule:
Executing Agency: M/S DP Jain & Co Infrastructure Pvt Ltd
Construction Supervision Consultant: SMEC International
AEP9B : Halagatti Junction(Ramdurga) to Badami(including Badami Bypass)
Road Length: 45 Km ;   Duration: 21 Months
Contract Amount: Rs 146.04 Crores
Schedule:
Executing Agency: M/S RNS Infrastructure Ltd
Construction Supervision Consultant: SMEC International
AEP9C : Badami Bypass junction - Pattadakallu - Kamatagi
Road Length: 43.13 Km ;   Duration: 21 Months
Contract Amount: Rs 110.89 Crores
Schedule:
Executing Agency: M/S Ashoka Buildcon Ltd
Construction Supervision Consultant: SMEC International